Projects
BSK takes pride in our work and the projects performed for our clients and our communities. For over 55 years, BSK has provided multi-discipline services ranging from analytical testing, construction material testing and inspection, to environmental, geotechnical and construction engineering.
Corporate Headquarters
691 N. Laverne Avenue, Suite 101
Fresno, CA 93727
Local: (559) 497-2880
Toll-Free: (800) 669-3201
Fresno, CA 93727
Local: (559) 497-2880
Toll-Free: (800) 669-3201
Hours of Operation
Monday thru Friday 8AM - 5PM
Individual Office Hours May Vary
Covid 19 protocols may impact normal business hours
Click Here to Find A Location Near You
Individual Office Hours May Vary
Covid 19 protocols may impact normal business hours
Click Here to Find A Location Near You
Recharge Fresno Project
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, projects, Uncategorized /by Kimberly StollRecharge Fresno Project This is one of the largest public work projects City of Fresno has ever constructed with construction cost over $400 million dollars. BSK was involved in these projects for over 7 years, from design to construction. Recharge Fresno Project Phases The projects consisted of the Friant-Kern Canal Pipeline, a 4.5 mile long, […]
Hayward USD Solar Project
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollHayward USD Solar Project The Hayward USD Solar Project flipped the switch becoming a cleaner, greener, school district. The Hayward USD Solar Project brought solar photovoltaic panels to thirty-three schools within the District. Additionally, all 33 sites received infrastructure improvements consisting of solar shade structures, roof, or ground mount arrays. With these upgrades the District […]
West Contra Costa USD Project
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollWest Contra Costa USD Project The West Contra Costa USD project consisted of adding solar systems to thirty-four school sites within the school district. The solar improvements included carports, shade structures, and rooftop mounted systems. These solar improvements are estimated to provide 6.3 megawatts of clean energy. BSK provided Geotechnical Engineering, Materials Testing Services, and […]
Dalton Reservoir Project
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollDalton Reservoir Project BSK holds an on-call environmental and geotechnical and materials testing contract with the City of Livermore. Dalton Reservoir Project was one of the task orders. This project replaced an existing 2.0 million-gallon steel water reservoir with a new 3.41 million-gallon steel reservoir on a 5.7-acre site in the northeastern portion of the […]
California Solar Project
/in Comat Services, CoMET, Construction, Engineering, projects, Uncategorized /by Kimberly StollCalifornia Solar Project The California Solar Project is a 1,200 acre project consisting of 171-MWdc of production facility. We are excited to announce that this facility will supply renewable energy to approximately 30,000 homes. Additionally, this project will help curb an estimated 22,000 cars worth of carbon dioxide yearly. BSK is proud to have worked […]
BSK: Downtown Merced Revitalization
/in Architecture, Buildings, Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, News, Uncategorized /by Kimberly StollBSK: Downtown Merced Revitalization BSK helps downtown Merced revitalize historical buildings. Three of Merced’s oldest buildings are receiving a face lift in hopes of bringing downtown Merced back to life. Downtown Merced has been under construction over the past year on Tioga Hotel, El Capitan Hotel, and the Mainzer Theatre. Not only are these three […]
Buckhorn Hotel Remodel
/in Comat Services, CoMET, Construction, Engineering, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollBuckhorn Hotel Remodel BSK proudly performed the geotechnical engineering and provided construction materials testing and special inspection for the Buckhorn Hotel Remodel. BSK’s services during construction included soil compaction testing, concrete sampling testing and special inspection services for the new pool, and spa and new lobby. The newly remodeled Cuyama Buckhorn hotel and restaurant has been […]
Tracy WWTP Project
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollTracy WWTP Project Phase I-Water Transmission Mains and Pump Station Improvements, Phase II-Wastewater Treatment Plant Effluent Outfall Pipeline. BSK’s scope of the Tracy WWTP Project supports $24 million of improvements to include within, and connections, to the City’s wastewater treatment plant, across roadways, agricultural and unimproved and unincorporated property. For BSK, it involves a combination […]
Kirker Pass Truck Climbing Lane
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollKirker Pass Truck Climbing Lane Kirker Pass Northbound Truck Climbing Lane project, client was Contra Costa County Public Works. The Kirker Pass truck climbing lane project is approximately two miles in length providing a 12-foot truck lane and 8-foot paved shoulder. The project also includes six retaining walls due to the existing slopes and drainage […]
West Hills Community College
/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized /by Kimberly StollWest Hills Community College, North District Center, Firebaugh, CA BSK provided geotechnical investigation and are currently working on the construction inspection and testing for the West Hills Community College Project in Firebaugh, CA. The new 40 million, two story 41,263 square foot center will be built at the existing District Facility. The new center will […]