From 2016 to current BSK has provide geotechnical investigation and construction material testing to support Meadows Field Airport on their major design and construction projects. The work on Runway 12L-30R has been completed in three phases over four years. The runway opening means the airport can more effectively keep the takeoff and landing of heavier commercial aircraft separate from smaller, lighter planes. Having both runways open and operating also helps keep Meadows flexible as demand grows and circumstances change.
The cost of this third and final phase of the runway project including construction, administration, inspection, and material testing was $14.5 million. In total, the cost of rehabilitating Meadows Field’s main runway is nearing $50 million.