BSK selected for on-call contract

BSK selected for on-call contract

BSK has provided the City of Fremont with on-call materials testing and special inspection services since 2016. As part of this on-going contract, #BSK has provided support to the City’s annual pavement rehabilitation projects and also directly supplemented the City’s in-house laboratory. Our initial on-call contract with the City expired at the end of 2020 and subsequently the City solicited another on-call contract Request for Qualifications for a period of up to 5 years to which BSK responded and was selected by the City for the new agreement. BSK is thankful to have the opportunity to continue supporting the City of Fremont where typical services include onsite and offsite materials sampling and testing for earthwork, concrete, and hot mix asphalt construction.

Gilbert Road Bridge

 

 

 

 

 

 

 

 

 

BSK is proud to be supporting Stanislaus County with the quality assurance materials testing and inspection services for the Gilbert Road Bridge over Turlock Irrigation District (TID) Ceres Main Canal project.  This Federally Funded project is located in Stanislaus County just south of the Hatch Road and Gilbert Road intersection, and will replace the “functionally obsolete” bridge with a double box culvert.  The project improves the roadway to accommodate local traffic and will bring the intersection of Gilbert Road and Hatch Road up to current County and American Association of State Highway and Transportation Officials (AASHTO) standards.  BSK is providing inspection and testing of earthwork, concrete and hot mix asphalt to the project.

 

 

 

 

 

Hwy 101 / Blossom Hill Road Interchange Improvement Project

BSK is proud to be providing Quality Assurance Materials Testing and Source Inspection Services to the US 101/Blossom Hill Road Interchange Improvement Project. The purpose of this project will improve traffic on the freeways and local roadways in the vicinity and improve bicycle and pedestrian travel along Blossom Hill Road and surrounding areas. The project has multiple components and phases including construction of a bridge structure over US 101, widening of the existing US 101 northbound off-ramp, reconfiguration of the eastbound approach to the Blossom Hill Road/northbound off-ramp, widening of the existing US 101 southbound off-ramp, realignment of the entrances to the existing US 101 southbound and northbound loop on-ramps, reconfiguration of Monterey Road to eastbound Blossom Hill Road connector ramp, and installation of a Bicycle/Pedestrian path. This is a great project for the BSK Team!

Centennial Corridor Project

BSK Associates has proudly partnered with AECOM to provide Quality Assurance Materials Testing and Source Inspection services for Phases 3 and 4 of the Centennial Corridor Project as part of the City of Bakersfield’s Thomas Roads Improvement Program. The Centennial Corridor Project constructs a new alignment and provides route continuity for State Route 58 from Cottonwood Road on existing SR 58 (East) to Interstate 5 (West).

The $48.6 million dollar Phase 3 project, known as Bakersfield Freeway Connector Project includes reconstruction of the westbound and southbound loop ramp at SR 99 entrance to Ming Avenue off-ramp and a new barrier-separated connector ramp to Ming Avenue. Major design elements include constructing two (2) new cast-in-place post tensioned prestress box girder bridges with four spans 1,165 feet in length and 39 feet wide, and one (1) cast-in-place post-tensioned box girder approximately 40 feet wide and 392 feet in length to widen the existing bridge, one (1) cast-in-place concrete pumping station with storage box and several retaining walls.

The $147 million dollar Phase 4 project, known as Mainline includes construction of a new freeway section between SR 99 and the Westside Parkway as part of the future SR 58 Centennial Corridor. The project includes construction of ten (10) new bridges including one (1) Viaduct, four (4) undercrossings, three (3) overcrossings, and two (2) connector overcrossings. In total, there will be approximately 40,000 cubic yards of concrete placed for bridge deck structures, approximately 673,000 cubic yards of import borrow, 41,100 tons of HMA paving, 41,200 cubic yards of continually reinforced concrete paving, and more than 83,000 linear feet of precast and cast-in-drilled hole concrete piling to support the structures.

BSK Associates has proudly served the City of Bakersfield and the surrounding communities since 1972. Bakersfield Freeway Connector Project and Centennial Corridor Mainline photos by City of Bakersfield.

 

Tehachapi Boulevard Bike Path

BSK Associates proudly served City of Tehachapi for their award-winning 1.5-mile Class One, two-lane paved bike path located on the north side of Tehachapi Boulevard between Hayes Street east and Steuber Road.  BSK’s scope of services for this project included Quality Assurance Materials Testing services for soil and aggregate base, asphalt consistency testing and concrete sampling and testing. The more than $1 million dollar project included an asphalt paved bike path, paint striping for enhanced safety to alert the cyclists and motorists at intersections, and new concrete curb separating the travel lane from the adjacent bike path.

 

Tehachapi Boulevard Bike Path. Photo Courtesy of City of Tehachapi

Tehachapi Boulevard Bike Path

Tehachapi Boulevard Bike Path

 

 

 

 

 

 

 

Tehachapi Boulevard Bike Path

Kern High School District ROC

In 2018, the Kern High School District started the construction of two (2) new building and the modernization of three (3) others at their Regional Occupational Center (ROC) campus in Bakersfield, California.  BSK Associates (BSK) had the privilege of serving the District by providing Construction Materials Testing and Inspection Services on this expansion project in 2018 and 2019.  This project included the construction of brand new Auto Center and Culinary Arts buildings and the remodel of the existing Cosmetology, Veterinary Science, and Construction Trades buildings.  BSK’s scope of services included the following:  subgrade soil compaction testing, concrete sampling and concrete batch plant inspection, post installed anchor inspection, welding inspection,  structural steel nondestructive testing, fireproofing, high strength bolting inspection, and floor flatness testing.

Regional Occupational Center photos by Kern High School District.

Kern High School District.

Regional Occupational Center photos by Kern High School District.

Kern High School District.

Regional Occupational Center photos by Kern High School District.

Kern High School District ROC. Regional Occupational Center photos by Kern High School District.

Regional Occupational Center photos by Kern High School District.

Regional Occupational Center photos by Kern High School District.

Regional Occupational Center photos by Kern High School District.

Regional Occupational Center photos by Kern High School District.

Beltway Operational Improvement Project

BSK Associates has proudly partnered with NV5 to provide Quality Assurance Materials Testing services for the Beltway Operational Improvement Project, an $81 million project as part of the City of Bakersfield’s Thomas Roads Improvement Program. This project includes operational improvements to interchange ramps and the construction of auxiliary lanes, retaining walls, and sound walls to improve safety and traffic operations along the SR 58 corridor east of SR 99 to Cottonwood Road, and at the SR 99/Ming Avenue Interchange.

 

Beltway Operational Improvement Project photo by City of Bakersfield.

City of Fontana Wastewater Trunk line and Industrial Monitoring Sampling

The City of Fontana owns and operates a satellite wastewater collection system and is responsible for administering the regulatory requirements for its Pretreatment and MS4 Storm water programs.  To maintain regulatory compliance, the City chose BSK Associates’ San Bernardino Laboratory to provide sampling and analytical services.

Fresno Southeast Surface Water Treatment Facility

The Southeast Surface Water Treatment Facility is a new treatment facility that will treat river water to drinking water standards and enable diversification of the City of Fresno’s water supply. BSK has been providing quality assurance construction materials testing services, which includes soils compaction testing, concrete, masonry and HMA sampling and testing.

Thomas R. Pollicita Middle School New Classroom Buildings, Phase I, Daly City, California

BSK geotechnical engineers conducted a geotechnical investigation, geologic hazards assessment, and provided geotechnical design recommendations with materials testing and special inspection services during construction to support modernization of the entire campus.