Entries by Kimberly Stoll

Brentwood Municipal Services Center Building

Municipal Services Center Building, Brentwood, CA The Brentwood Municipal Services Center Building project consisted of the construction of an approximately 14,000 square-foot, 1-story, L-shaped building with a slab-on-grade floor. The new building extends over an area formerly occupied by a 1-story, approximately 2,000 square foot building, paved paving and driveways, concrete flatwork, and concrete walls. […]

Veteran’s Center and ABC Building

Veteran’s Center and ABC Building BSK Associates is proud to have provided the geotechnical investigation and geologic seismic hazards report for the Veterans Center and ABC Building. The Veteran’s Center, a 5,000-square foot facility, blends renovation and new construction, adding conference rooms, computer labs and a student lounge. The construction project was recently completed. The […]

Bernal Park Project

Bernal Park, Pleasanton, CA  The Oak Woodland trail Bernal Park project is part of a new 60-acre park in Pleasanton. The asphalt concrete trails were built on up to 10 feet of engineered fill and included underlying drainage culverts and riprap slope protection adjacent to the trails. BSK provided Geotechnical Engineering and Materials Testing Services […]

Oakley Recreation Center Project

Oakley Recreation Center, Oakley, CA The Oakley Recreation Center Project consisted of the construction of an approximately 10,000 square feet single-story building and the relocation of an existing approximately 3,000 square foot, single story modular building. Other improvements include an amphitheater, an athletic field with natural turf, new asphalt concrete paved parking and driveways, concrete […]

EPAs new plan to combat PFAS

EPAs new plan to combat PFAS   The Environmental Protection Agency (EPA) has announced new plans to combat per- and polyfluoroalkyl substances (PFAS). The EPA released four new drinking water health advisories to aid in America’s plan to furnish clean drinking water. Additionally, the EPA announced fresh fiscal opportunities to combat PFAS pollution through a […]

BSK Provided Construction Services for the Livermorium Plaza Project

BSK Provided Construction Services for the Livermorium Plaza Project BSK is proud to have provided construction services for the Livermorium Plaza Project. Under the direction of BSK Associates Livermore Branch Manager Cristiano Melo, PE,GE, BSK provided the geotechnical design and over-site during the construction, removal of the contaminants and for the underpinning of the adjacent […]

Construction of New BSK Lab

Construction of New BSK Lab BSK is excited to give our clients and business partners the ability to watch the construction of our new BSK lab come together. The new Analytical Lab in Fresno is coming along great! It is on the corner of Laverne and Armstrong, with close access to two major freeways, making […]

Delano Earlimart Irrigation District

Delano Earlimart Irrigtion District Water Recharge Projects  BSK has been working with the Delano Earlimart Irrigation District to develop their groundwater recharge projects totaling more than 300 acres of recharge facilities.  The groundwater recharge project is known as the Turnipseed Recharge Basin, which could receive water from either the District’s distribution system of from direct […]

Manteca Digester Improvements

Manteca Digester Improvements Manteca Water Quality Control Facility Digester Improvements, Manteca, CA As part of the City of Manteca’s overall expansion of the wastewater plant capacity from 7 million gallons per day to 20 million gallons per day and other improvements, the Manteca Water Quality Control Facility Digester improvements included construction of two new 65-foot […]

BSK Award Winning Projects

BSK Award Winning Projects BSK Associates is proud to announce that we acted as consultants on two projects that received awards from American Council of Engineering Companies (ACEC). Award Winning Project: Delano Earlimart Irrigation District, Water Recharge Projects, Tulare and Kern Counties, CA  Delano Earlimart Irrigation District has been working to develop their groundwater recharge […]