BSK Associates Awarded New Contract with SSUSD

BSK Associates Awarded New Contract with SSUSD

BSK Associates is thrilled to announce our latest project awarded by the Sierra Sands Unified School District (SSUSD). Our team has been selected to conduct a fault hazard investigation for the proposed Vieweg Elementary School site. This critical study aims to ensure the safety and stability of the new school by thoroughly examining a potential active fault zone on the property.

Meet the Team

At BSK Associates, we are committed to the highest standards of safety and precision. Our experienced team, led by some of the most esteemed professionals in the field, will manage this project with meticulous care.

Leading the project will be Adam Terronez, PE, GE, serving as the lead Geotechnical Engineer. With extensive experience in Geotechnical Engineering and a deep understanding of seismic safety, Adam brings invaluable expertise to this initiative. Supporting him are Michael Romero and Neil McConnell, our lead Certified Engineering Geologists, who will be instrumental in conducting the fault trenching investigation. We would also like to thank BSK’s Tony Martin and Kevin Grove that are providing environmental assessment for the property and oversight for the investigation

Additionally, Omar Khan played a crucial role in preparing our winning proposal, ensuring that BSK’s qualifications and dedication to excellence were highlighted. His efforts have paved the way for our team to contribute significantly to the safety and development of the new school site.

Commitment to the Community

BSK Associates has a long-standing relationship with SSUSD, and we are honored to continue our partnership by providing essential services that contribute to the district’s growth and safety. Some notable prior projects with SSUSD including:

  • Richmond Elementary School: BSK provided Geotechnical Engineering, Geologic/Seismic Hazards Assessment, and Construction Materials Testing Services for the new Richmond Elementary School Campus that is currently under construction.
  • Murray Middle School Campus: BSK provided Geotechnical Engineering, Geologic/Seismic Hazards Assessment, Fault Trenching Investigation, Environmental Assessments and Construction Materials Testing Services.
  • Burrough High School Modernization: BSK has proudly contributed to the modernization of Burrough High School by providing comprehensive Geotechnical Engineering, Geologic/Seismic Hazards Assessment, and Construction Materials Testing Services.
  • At Faller Elementary School, we recently delivered Construction Materials and Special Inspection Services for the installation of a new 60-foot tower, playground remodel, and new shade structures. Our team is also actively engaged in Construction Materials Testing and Special Inspection Services for the new Transitional Kindergarten (TK) buildings at both Faller Elementary School and Las Flores Elementary School.
  • Additionally, we have successfully completed Construction Materials Testing and Special Inspection Services for relocatable classrooms, ADA improvements, and shade structures at Vieweg Elementary School, Pierce Elementary School, Richmond Elementary School, Gateway Elementary School, and James Monroe Middle School. Santiago Espinoza leads these projects as BSK’s dedicated project manager.

The proposed Vieweg Elementary School is a significant development for the community, and we are dedicated to ensuring its foundation is secure and resilient.

“We are very excited about this opportunity to serve Sierra Sands Unified School District on another great facility that will serve students, faculty, staff, and the Ridgecrest community,” says Adam Terronez, PE, GE, Bakersfield Branch Manager.

Thank you SSUSD for your continued support and trust in BSK Associates. Together, we are building a safer and stronger future for our communities.

Meet the Staff

Like us on Facebook. Also, follow us on LinkedIn. Explore our other projects here! Have a question about the services we offer? Check out our webpage @bskassociates.com.

Veteran’s Center and ABC Building

Veteran’s Center and ABC Building

BSK Associates is proud to have provided the geotechnical investigation and geologic seismic hazards report for the Veterans Center and ABC Building. The Veteran’s Center, a 5,000-square foot facility, blends renovation and new construction, adding conference rooms, computer labs and a student lounge. The construction project was recently completed.

The Administration, Bookstore and Conference Center Building, or ABC Building, will span 67,000 square feet and cost $30 million, pulling funds from both Measure J and remaining funds from the 2002 voter-approved Measure G.  The construction project was recently completed. BSK associates provided the geotechnical investigation and geologic seismic hazards report.

 

BSK strongly believes in giving back to the communities in which we work. We make sure our community involvement goals have a positive impact on the communities which we serve; because, in the end it’s all about community.

Like us on Facebook. Also, follow us on LinkedIn and Twitter. Additionally, explore our other projects here! Or, check out some of these amazing BSK projects listed below.

Hayward USD Solar Project

Bernal Park Project

Oakley Recreation Center

Have a question about the services we offer? Check out our webpage @bskassociates.com.
Looking for an awesome place to work? Because, you’ve found it! Moreover, don’t forget to check out our job opportunities page for more details.

Bernal Park Project

Bernal Park, Pleasanton, CA 

The Oak Woodland trail Bernal Park project is part of a new 60-acre park in Pleasanton. The asphalt concrete trails were built on up to 10 feet of engineered fill and included underlying drainage culverts and riprap slope protection adjacent to the trails. BSK provided Geotechnical Engineering and Materials Testing Services to the project, which is a task order to an On-Call contract that BSK has held for numerous contracting periods with the City of Pleasanton, California. BSK also provided geotechnical recommendations for suitability of proposed import soil as engineered fill and performed interpretation of analytical testing for proposed import soils from over 15 different import sites. Services also included special inspection and materials testing services for various structures throughout the park.

Follow Us and Like Us

BSK strongly believes in giving back to the communities in which we work. We make sure our community involvement goals have a positive impact on the communities which we serve; because, in the end it’s all about community.

Like us on Facebook. Also, follow us on LinkedIn and Twitter. Additionally, explore our other projects here!

Have a question about the services we offer? Check out our webpage @bskassociates.com.
Moreover, don’t forget to check out our job opportunities page for more details.

Oakley Recreation Center Project

Oakley Recreation Center, Oakley, CA

The Oakley Recreation Center Project consisted of the construction of an approximately 10,000 square feet single-story building and the relocation of an existing approximately 3,000 square foot, single story modular building. Other improvements include an amphitheater, an athletic field with natural turf, new asphalt concrete paved parking and driveways, concrete flatwork, bleachers and a baseball backstop for the athletic field, fences, underground utilities, landscaping, bio-swales/infiltration basins, and a new traffic signal at O’Hara Avenue near the entrance to the site. BSK performed the geotechnical investigation for this project and provided compaction and materials testing and special inspection services during construction.

Oakley Recreation Center Project

BSK strongly believes in giving back to the communities in which we work. We make sure our community involvement goals have a positive impact on the communities which we serve; because, in the end it’s all about community.

Like us on Facebook. Also, follow us on LinkedIn and Twitter. Additionally, explore our other projects here!

Have a question about the services we offer? Check out our webpage @bskassociates.com.
Moreover, don’t forget to check out our job opportunities page for more details.

BSK: Downtown Merced Revitalization

BSK: Downtown Merced Revitalization

BSK helps revamp historical buildings in downtown Merced.

Revamp on historical buildings in downtown Merced.

BSK helps downtown Merced revitalize historical buildings. Three of Merced’s oldest buildings are receiving a face lift in hopes of bringing downtown Merced back to life. Downtown Merced has been under construction over the past year on Tioga Hotel, El Capitan Hotel, and the Mainzer Theatre. Not only are these three historical sites some of the oldest buildings in Merced, built as early as 1920’s, they also have noteworthy historical pasts. The goal of this project is to renovate these notorious sites, while still maintaining some historical integrity.

BSK Associates has played a key role in the renovations of each of these buildings. After BSK’s initial Geotechnical Engineering Investigation, South Valley Regional Manager, On Man Lau, PE, GE, was able to reduce the size of the micropiles. This reduction saved the developer thousands of dollars towards the renovations.

BSK: Downtown Merced Revitalization

All three renovations are still in progress. However, we are excited to announce the Tioga is nearing completion. The El Capitan Hotel and Mainzer Theater are also well on their way.

The Tioga Hotel becomes Luxury Apartments

Tioga Hotel, Downtown Merced Revitalization.

The Tioga Hotel is one of the oldest and largest buildings in the City of Merced. Built in 1928, the Tioga was home to Merced’s first neon sign, was a key player in the wartime efforts during World War II, and attracted numerous notable figures and royalty from across the world, including Calvin Coolidge, Eleanor Roosevelt, Marilyn Monroe, and John Kennedy. The National Register of Historical Places inducted the Tioga in 1980. Due to its prestigious history it was important to all those involved to preserve as much of the building as possible, while upgrading the structure to today’s safety standards.

BSK had the opportunity of performing field exploration on the Tioga; designing micropiles for a seismic retrofit on the existing six story reinforced concrete structure. Furthermore, we performed materials testing and inspection on the Tioga including but not limited to:

  • Drilled Pier Soils Observations

    Tioga Hotel. Downtown Merced Revitalization.

  • Reinforced Concrete Inspections
  • Concrete Sampling and Testing
  • Post Installed Anchor Inspections
  • Shop and Field Welding Inspections
  • High Strength Bolting Inspections
  • Epoxy Rebar Inspections
  • Shear wall nailing Inspections
  • Wood Moisture Testing

Features include; studios, one-and two-bedroom apartments, and penthouse apartments. The lobby will feature social work-spaces, a fitness center, and private conference and event rooms. There are also plans to include a retail area on the street level space.

El Capitan Hotel Renovations

BSK helps revamp historical buildings in downtown Merced

UT inspection at El Capitan. Photo features the Tioga in background.

El Capitan is another historic remodel for the City of Merced. The original EL Capitan was Merced’s first hotel, built in 1872, the same year the City of Merced was established. Unfortunately, in 1931 the hotel burnt, but it was remodeled and has been left as it is since 1936.

As with the Tioga Hotel, BSK has helped with the renovations on El Capitan from the ground up,  from performing Ultrasonic Testing on the primary metal structure of the building in local weld shops, to being on the El Capitan job site, conducting Reinforced Concrete Inspection.

Tioga Hotel features 114 rooms restored to encompass the original feel of the hotel and honor the historic El Capitan as the town’s first railroad depot.  The space will also feature a restaurant, a café, and an amazing courtyard lounge.

The Mainzer Theater

The Mainzer Theatre revamp in Downtown Merced.

Although construction on this building originally began in the 1920’s, the Mainzer Theatre did not open its doors until Halloween, October 31st, of 1931. The Mainzer Theatre is one of the most recognized landmarks in Merced. Originally built by famous architects from San Francisco, the Reid Brothers. The Spanish Courtyard design was very unique. According to the Merced Theatre Foundation, which was responsible for the initial restoration of the building in 2012, “Patrons that visited the theatre believed that there were people living in the windows of the courtyard”. The Mainzer Theatre has been a special place for those of Merced, from school graduations and dance performances, to weddings, and of course movies; the theatre has been visited by many. Once again because of its rich history it was important to keep the historical feel on this project.

Additionally, BSK was asked to provide our services for the Mainzer Theatre. Some of the work we will be conducting includes:

  • Soils Observations and Compaction Testing.
  • Reinforced Concrete Inspections.
  • Concrete Sampling and Testing.
  • Post Installed Anchor Inspections.
  • Shop Welding Inspections.

Upon completion The Mainzer Theatre will have 4 bowling lanes, a restaurant, a stage, movie theater, and possibly a bar. Renovations are not scheduled to be completed until late 2020. However, they are already well into renovations.

 

 

 

Lastly, Mainzer Theatre. Merced Revamp.

Special Thanks

The downtown revamp has been a very rewarding project for BSK. We thrive on being a part of a project that truly makes a difference in the community.

Lastly, we’d like to give a special thanks to all of our BSK employees and our client!

Follow Us and Like Us: 

BSK strongly believes in giving back to the communities in which we work. Additionally, we believe the well-being of our communities has a direct bearing on the success of BSK, and our employees. We strive to make sure our community involvement goals have a positive impact on the communities which we serve.

Want to be in the “know” on upcoming BSK events, community service, and projects?

 

Like us on Facebook.

Follow us on LinkedIn and Twitter.

Also, don’t forget to check out our blog page to find out more information.

Looking for a Great Places to Work? You’ve found it! We are proud to be Great Place to Work certified. Check out our job opportunities page for more details.