Marsh Creek Road Bridge

November 19, 2021/in Comat Services, CoMET, Construction, Engineering, Geotech, Geotechnical Services, projects, Uncategorized/by bskassociates

Marsh Creek Road Bridge

Marsh Creek Road Bridge is located in the unincorporated area of east Contra Costa County between Clayton and Brentwood.  This $4.9 million project replaced an existing 29.5 ft. wide by 44.5 ft. long steel girder bridge with a new, wider, two‐stage precast/pre‐stressed wide‐flange California Bulb Tee girder bridge. Additionally, each bridge abutment had either wingwall or retaining walls constructed in each corner of the bridge.

The new bridge has two 12 ft. lanes and two 8 ft. shoulders. Furthermore, several Accelerated Bridge Construction (ABC) techniques were used in an area which had environmental restrictions. In addition, the project area had 6,000 vehicles/day traveling along Marsh Creek Road. Construction was staged in four phases.

This project was primarily funded by Federal Highway Bridge Replacement funding, Local Road funds, and SB‐1 funds. Moreover, the project was designed to Caltrans standards.

This project used high early strength concrete. In addition, concrete accelerants, and soil‐cement backfill with geogrid were used. This project further called for 22 ft temporary soil‐nail shoring walls along with a Soldier pile wall with concrete facing. Further, the project team approved two special concrete mix designs, one with higher cement content and water reducers (Delvo). The second with concrete accelerant BASF MasterSet AC 534, which was pre‐approved through Caltrans. This helped achieve over 4,200 psi concrete in 3 days.

BSK Associates

BSK acted as a subconsultant to Substrate, Inc., and under Hill International’s direction. Moreover, BSK’s role in the project was to support source inspection of six – 88’ 3” long girders at Confab LLC in Lathrop. Additionally we provided Quality Assurance materials testing/special inspection of structural backfill, and aggregate base; as well as, hot mix asphalt and structural concrete construction elements.

This project was an awardee of the American Public Works Association for Project of the Year in 2018. BSK Associates is proud to have been a part of such an amazing project! 

Check out these additional Road Projects.

Hwy 101 / Blossom Hill Road Interchange Improvement Project

Beltway Operational Improvement Project

Centennial Corridor Project

Hwy 120 / Union Road, Manteca, CA

 

Follow Us and Like Us

 

BSK strongly believes in giving back to our communities. We make sure our community involvement goals have a positive impact on the communities which we serve; because, it’s all about community.

Want to be in the “know” on upcoming BSK events, community service, and projects?
Like us on Facebook. Also, follow us on LinkedIn. Additionally, explore our other projects here!

Have a question about the services we offer? Check out our webpage @bskassociates.com.
Looking for a Great Places to Work? Because, you’ve found it! We are proud to be Great Place to Work certified. Moreover, Don’t forget to check out our job opportunities page for more details.

https://www.bskassociates.com/wp-content/uploads/2021/11/Image-Sent-from-Client-July-2018_e-mail-from-Tim.jpg 768 1024 bskassociates /wp-content/uploads/2026/07/bsk-logo-60.png bskassociates2021-11-19 01:18:282021-11-19 01:18:28Marsh Creek Road Bridge
  • Understanding Your Insurance CoverageJuly 6, 2026 - 6:00 am
  • RCRA Appendix IX Groundwater Monitoring
    RCRA Appendix IX Groundwater Monitoring: BSK Expands ServicesJune 19, 2026 - 8:26 am
  • Hexavalent Chromium Testing in California
    Hexavalent Chromium Testing in CaliforniaMay 20, 2026 - 11:00 am
  • Q1 Corporate Sponsorship Supports San Ramon FC 
    Building Community Through Purpose: BSK Associates’ Q1 Corporate Sponsorship Supports San Ramon FCMay 15, 2026 - 7:40 am
  • Preliminary Environmental Assessment for School Sites
    Preliminary Environmental Assessment For School SitesMay 6, 2026 - 8:47 am
  • Red Flags In Contract Language
    Red Flags in Contract LanguageApril 22, 2026 - 9:37 am
  • communication in geoprofessional practice
    Communication in the Geoprofessional PracticeMarch 26, 2026 - 2:50 pm
  • Phase I Environmental Site AssessmentMarch 3, 2026 - 3:18 pm
  • BSK Associates Announces Q4 2025 Corporate Sponsorship Winner and Selected Community OrganizationFebruary 19, 2026 - 3:06 pm
  • Taming the Time Management BeastJanuary 6, 2026 - 8:44 am
  • Unlock the Power of Biomass with Fast, Reliable Analytical TestingNovember 10, 2025 - 5:00 am
  • Renea Rangell to Deliver Keynote at ACIL Annual Meeting: Elevating Lab Leadership in 2025
    Renea Rangell to Deliver Keynote at ACIL Annual Meeting: Elevating Lab Leadership in 2025October 31, 2025 - 9:16 am
  • BSK Associates Announces 3rd Quarter Sponsorship of Kevvy’s Vision Project, Honoring Legacy of Community ServiceOctober 27, 2025 - 9:21 am
  • Why Testing Residential Well Water Is Crucial When Buying a HomeOctober 13, 2025 - 5:00 am
  • Building Your Geoprofessional Network: From Conference Small Talk to Lasting Business RelationshipsOctober 7, 2025 - 4:30 am
BSK Associates

(800) 669-3201

Corporate Headquarters

691 N. Laverne Ave. STE 101
Fresno, CA 93727
Local: (559) 497-2880

Hours of Operation

Monday – Friday 8 AM - 5 PM
Office hours vary by location

Subscribe to BSK PULSE

Thank you for signing up.
Please correct the marked field(s) below.
1,true,6,Contact Email,2 1,false,1,First Name,2 1,false,1,Last Name,2
Close
© 2026 Copyright BSK Associates | Accessibility |  NFY Interactive
  • Link to Facebook Link to Facebook Link to Facebook
  • Link to Instagram Link to Instagram Link to Instagram
  • Link to LinkedIn Link to LinkedIn Link to LinkedIn
  • Link to Youtube Link to Youtube Link to Youtube
Link to: Geneseo Road Bridge Project Link to: Geneseo Road Bridge Project Geneseo Road Bridge Project Link to: West Hills Community College Link to: West Hills Community College West Hills Community College
Scroll to top Scroll to top Scroll to top