BSK Associates
  • SERVICES
    • Environmental Analysis
    • Environmental Consulting
    • Geotechnical
    • Special Inspection
    • Materials Testing
    • Geophysical 
  • MARKETS
    • Agricultural
    • Commercial & Industrial
    • Education
    • Government
    • Healthcare
    • Energy
    • Transportation
    • Water Resources
    • Solid Waste
  • ABOUT
    • Executive & Board
    • Senior Leadership
  • CAREERS
  • CONTACT
  • CLIENT CONNECT
  • Menu Menu

Meadows Field Airport

June 28, 2023/in Comat Services, CoMET, Construction, Engineering, Environmental, Environmental Services, Geotech, Geotechnical Services, projects, Uncategorized/by bskassociates

Meadows Field Airport

From 2016 to current BSK has provide geotechnical investigation and construction material testing to support Meadows Field Airport on their major design and construction projects. The work on Runway 12L-30R has been completed in three phases over four years. The runway opening means the airport can more effectively keep the takeoff and landing of heavier commercial aircraft separate from smaller, lighter planes. Having both runways open and operating also helps keep Meadows flexible as demand grows and circumstances change.

The cost of this third and final phase of the runway project including construction, administration, inspection, and material testing was $14.5 million. In total, the cost of rehabilitating Meadows Field’s main runway is nearing $50 million.

 

County of Kern, Meadows Field Airport Runway 12L-30R Rehabilitation, Bakersfield, CA

BSK provided geotechnical engineering during the design phase and QA construction material testing services during the construction phase of the project. The existing runway is approximately 150 feet wide and is approximately 13,000 feet in length. Nineteen taxiways are included within the limits of the project. BSK’s responsibilities included providing geotechnical data compatible with FAA AC 150/5320-6 Airport Design and Evaluation Requirements. BSK’s geotechnical investigation included a total of sixty-one (61) geotechnical borings at the existing runaway and an additional sixteen (16) core-only locations. Special challenges include coring the existing pavement section with thicknesses up to 24 inches and work within an active runway. BSK’s geotechnical investigation was performed at night between the hours of approximately 12am (midnight) and 5:30am. Site preparation recommendations included subgrade re-compaction recommendations and recommendations for aggregate base placement and compaction. The geotechnical laboratory testing included California Bearing Ratio, particle size, soil corrosivity, in-place moisture content and dry density, Atterberg Limits, and moisture-density relationship testing. During the construction phase of work, BSK provided QA oversight during paving operations including aggregate base course sampling, concrete sampling, laboratory compaction of Marshall briquettes at the production plant, HMA core sample pick up, laboratory testing and preparation of daily field and laboratory test reports.

County of Kern, Meadows Field Airport Taxiway ‘A’ Reconstruction and Rehabilitation, Bakersfield, CA

BSK provided geotechnical engineering investigation, geotechnical laboratory testing during the initial design stage and quality assurance testing services during the construction phases of the project that includes the following facility improvements: Demolishing eight (8) existing taxiways which connect Taxiway ‘A’ to the main facility (approximately 200-feet long and 75’ wide), Constructing two (2) new taxiways between Taxiway A and the main facility (approximately 200-feet long and 75’ wide), Constructing one (1) taxiway parallel to Taxiway ‘A’ in front of the main facility at the apron (approximately 3,800 feet long and 75 feet wide), Reconstruction of the asphalt pavement section will extend for the entire length of Taxiway ‘A’ (approximately 11,400 feet long and 100 feet wide), and Reconstruction of seven (7) taxiways connecting to Taxiway ‘A’ (variable dimensions). BSK’s responsibilities included providing geotechnical data compatible with FAA AC 150/5320-6 Airport Design and Evaluation Requirements. BSK’s geotechnical investigation included a total of seventy-four (74) geotechnical borings at the existing taxiway and an additional eleven (11) core-only locations. Due to work performed at an active runway. BSK’s geotechnical investigation was performed at night between the hours of approximately 12am (midnight) and 5:30am. The geotechnical laboratory testing included California Bearing Ratio, particle size, soil corrosivity, in-place moisture content and dry density, Atterberg Limits, and moisture-density relationship testing.

 

BSK strongly believes in giving back to the communities in which we work. We make sure our community involvement goals have a positive impact on the communities which we serve; because, in the end it’s all about community.

Looking to learn more about BSK Associates Geoprofessional and Analytical Services, check our website and connect with us to see how we can help you.  www.bskassociates.com/ 

https://www.bskassociates.com/wp-content/uploads/2023/06/IMG_0970-scaled-1.jpg 1707 2560 bskassociates /wp-content/uploads/2026/07/bsk-logo-60.png bskassociates2023-06-28 18:42:172023-06-28 18:42:17Meadows Field Airport
  • Understanding Your Insurance CoverageJuly 6, 2026 - 6:00 am
  • RCRA Appendix IX Groundwater Monitoring
    RCRA Appendix IX Groundwater Monitoring: BSK Expands ServicesJune 19, 2026 - 8:26 am
  • Hexavalent Chromium Testing in California
    Hexavalent Chromium Testing in CaliforniaMay 20, 2026 - 11:00 am
  • Q1 Corporate Sponsorship Supports San Ramon FC 
    Building Community Through Purpose: BSK Associates’ Q1 Corporate Sponsorship Supports San Ramon FCMay 15, 2026 - 7:40 am
  • Preliminary Environmental Assessment for School Sites
    Preliminary Environmental Assessment For School SitesMay 6, 2026 - 8:47 am
  • Red Flags In Contract Language
    Red Flags in Contract LanguageApril 22, 2026 - 9:37 am
  • communication in geoprofessional practice
    Communication in the Geoprofessional PracticeMarch 26, 2026 - 2:50 pm
  • Phase I Environmental Site AssessmentMarch 3, 2026 - 3:18 pm
  • BSK Associates Announces Q4 2025 Corporate Sponsorship Winner and Selected Community OrganizationFebruary 19, 2026 - 3:06 pm
  • Taming the Time Management BeastJanuary 6, 2026 - 8:44 am
  • Unlock the Power of Biomass with Fast, Reliable Analytical TestingNovember 10, 2025 - 5:00 am
  • Renea Rangell to Deliver Keynote at ACIL Annual Meeting: Elevating Lab Leadership in 2025
    Renea Rangell to Deliver Keynote at ACIL Annual Meeting: Elevating Lab Leadership in 2025October 31, 2025 - 9:16 am
  • BSK Associates Announces 3rd Quarter Sponsorship of Kevvy’s Vision Project, Honoring Legacy of Community ServiceOctober 27, 2025 - 9:21 am
  • Why Testing Residential Well Water Is Crucial When Buying a HomeOctober 13, 2025 - 5:00 am
  • Building Your Geoprofessional Network: From Conference Small Talk to Lasting Business RelationshipsOctober 7, 2025 - 4:30 am
BSK Associates

(800) 669-3201

Corporate Headquarters

691 N. Laverne Ave. STE 101
Fresno, CA 93727
Local: (559) 497-2880

Hours of Operation

Monday – Friday 8 AM - 5 PM
Office hours vary by location

Subscribe to BSK PULSE

Thank you for signing up.
Please correct the marked field(s) below.
1,true,6,Contact Email,2 1,false,1,First Name,2 1,false,1,Last Name,2
Close
© 2026 Copyright BSK Associates | Accessibility |  NFY Interactive
  • Link to Facebook Link to Facebook Link to Facebook
  • Link to Instagram Link to Instagram Link to Instagram
  • Link to LinkedIn Link to LinkedIn Link to LinkedIn
  • Link to Youtube Link to Youtube Link to Youtube
Link to: BSK Associates Grand Opening Link to: BSK Associates Grand Opening BSK Associates Grand OpeningBSK Associates Grand Opening Link to: Lead and Copper Rule Explained Link to: Lead and Copper Rule Explained Lead and Copper Rule ExplainedLead and Copper Rule Explained
Scroll to top Scroll to top Scroll to top