BSK Associates
  • SERVICES
    • Environmental Analysis
    • Environmental Consulting
    • Geotechnical
    • Special Inspection
    • Materials Testing
    • Geophysical 
  • MARKETS
    • Agricultural
    • Commercial & Industrial
    • Education
    • Government
    • Healthcare
    • Energy
    • Transportation
    • Water Resources
    • Solid Waste
  • ABOUT
    • Executive & Board
    • Senior Leadership
  • CAREERS
  • CONTACT
  • CLIENT CONNECT
  • Menu Menu

Hwy 101 / Blossom Hill Road Interchange Improvement Project

November 5, 2020/in Comat Services, CoMET, projects, Uncategorized/by bskassociates

BSK is currently providing Quality Assurance Materials Testing and Source Inspection Services to the US 101/Blossom Hill Road Interchange Improvement Project. The purpose of this project will improve traffic on the freeways and local roadways in the vicinity and improve bicycle and pedestrian travel along Blossom Hill Road and surrounding areas. The project has multiple components and phases including construction of a bridge structure over US 101, widening of the existing US 101 northbound off-ramp, reconfiguration of the eastbound approach to the Blossom Hill Road/northbound off-ramp, widening of the existing US 101 southbound off-ramp, realignment of the entrances to the existing US 101 southbound and northbound loop on-ramps, reconfiguration of Monterey Road to eastbound Blossom Hill Road connector ramp, and installation of a Bicycle/Pedestrian path.
BSK’s services include materials testing of soils, aggregate base, hot-mix asphalt, structural concrete, and structural steel elements. BSK’s source inspection scope included prefabricated concrete and steel items, as well as anchorage, epoxy coated reinforcement, welded rebar hoops, rebar couplers, reinforcing steel and prestressing tendons, column casings, and a prefabricated steel pedestrian bridge.

https://www.bskassociates.com/wp-content/uploads/2020/10/Pile-driving-and-splicing-operations-at-the-US-101-Blossom-Hill-Road-Interchange-Improvement-Project-e1634067505366.png 1147 860 bskassociates /wp-content/uploads/2026/07/bsk-logo-60.png bskassociates2020-11-05 16:42:422020-11-05 16:42:42Hwy 101 / Blossom Hill Road Interchange Improvement Project

Centennial Corridor Project

August 10, 2020/in Comat Services, CoMET, projects, Uncategorized/by bskassociates

BSK Associates has proudly partnered with AECOM to provide Quality Assurance Materials Testing and Source Inspection services for Phases 3 and 4 of the Centennial Corridor Project as part of the City of Bakersfield’s Thomas Roads Improvement Program. The Centennial Corridor Project constructs a new alignment and provides route continuity for State Route 58 from Cottonwood Road on existing SR 58 (East) to Interstate 5 (West).

The $48.6 million dollar Phase 3 project, known as Bakersfield Freeway Connector Project includes reconstruction of the westbound and southbound loop ramp at SR 99 entrance to Ming Avenue off-ramp and a new barrier-separated connector ramp to Ming Avenue. Major design elements include constructing two (2) new cast-in-place post tensioned prestress box girder bridges with four spans 1,165 feet in length and 39 feet wide, and one (1) cast-in-place post-tensioned box girder approximately 40 feet wide and 392 feet in length to widen the existing bridge, one (1) cast-in-place concrete pumping station with storage box and several retaining walls.

The $147 million dollar Phase 4 project, known as Mainline includes construction of a new freeway section between SR 99 and the Westside Parkway as part of the future SR 58 Centennial Corridor. The project includes construction of ten (10) new bridges including one (1) Viaduct, four (4) undercrossings, three (3) overcrossings, and two (2) connector overcrossings. In total, there will be approximately 40,000 cubic yards of concrete placed for bridge deck structures, approximately 673,000 cubic yards of import borrow, 41,100 tons of HMA paving, 41,200 cubic yards of continually reinforced concrete paving, and more than 83,000 linear feet of precast and cast-in-drilled hole concrete piling to support the structures.

BSK Associates has proudly served the City of Bakersfield and the surrounding communities since 1972. Bakersfield Freeway Connector Project and Centennial Corridor Mainline photos by City of Bakersfield.

 

https://www.bskassociates.com/wp-content/uploads/2020/08/BFC.jpg 1873 2500 bskassociates /wp-content/uploads/2026/07/bsk-logo-60.png bskassociates2020-08-10 20:30:472020-08-10 20:30:47Centennial Corridor Project

Tehachapi Boulevard Bike Path

June 3, 2020/in Comat Services, CoMET, Uncategorized/by bskassociates

BSK Associates proudly served City of Tehachapi for their award-winning 1.5-mile Class One, two-lane paved bike path located on the north side of Tehachapi Boulevard between Hayes Street east and Steuber Road.  BSK’s scope of services for this project included Quality Assurance Materials Testing services for soil and aggregate base, asphalt consistency testing and concrete sampling and testing. The more than $1 million dollar project included an asphalt paved bike path, paint striping for enhanced safety to alert the cyclists and motorists at intersections, and new concrete curb separating the travel lane from the adjacent bike path.

 

Tehachapi Boulevard Bike Path. Photo Courtesy of City of Tehachapi

Tehachapi Boulevard Bike Path

Tehachapi Boulevard Bike Path

 

 

 

 

 

 

 

Tehachapi Boulevard Bike Path

https://www.bskassociates.com/wp-content/uploads/2020/06/untitled.png 960 1280 bskassociates /wp-content/uploads/2026/07/bsk-logo-60.png bskassociates2020-06-03 18:18:092020-06-03 18:18:09Tehachapi Boulevard Bike Path
Page 4 of 41234
  • Understanding Your Insurance CoverageJuly 6, 2026 - 6:00 am
  • RCRA Appendix IX Groundwater Monitoring
    RCRA Appendix IX Groundwater Monitoring: BSK Expands ServicesJune 19, 2026 - 8:26 am
  • Hexavalent Chromium Testing in California
    Hexavalent Chromium Testing in CaliforniaMay 20, 2026 - 11:00 am
  • Q1 Corporate Sponsorship Supports San Ramon FC 
    Building Community Through Purpose: BSK Associates’ Q1 Corporate Sponsorship Supports San Ramon FCMay 15, 2026 - 7:40 am
  • Preliminary Environmental Assessment for School Sites
    Preliminary Environmental Assessment For School SitesMay 6, 2026 - 8:47 am
  • Red Flags In Contract Language
    Red Flags in Contract LanguageApril 22, 2026 - 9:37 am
  • communication in geoprofessional practice
    Communication in the Geoprofessional PracticeMarch 26, 2026 - 2:50 pm
  • Phase I Environmental Site AssessmentMarch 3, 2026 - 3:18 pm
  • BSK Associates Announces Q4 2025 Corporate Sponsorship Winner and Selected Community OrganizationFebruary 19, 2026 - 3:06 pm
  • Taming the Time Management BeastJanuary 6, 2026 - 8:44 am
  • Unlock the Power of Biomass with Fast, Reliable Analytical TestingNovember 10, 2025 - 5:00 am
  • Renea Rangell to Deliver Keynote at ACIL Annual Meeting: Elevating Lab Leadership in 2025
    Renea Rangell to Deliver Keynote at ACIL Annual Meeting: Elevating Lab Leadership in 2025October 31, 2025 - 9:16 am
  • BSK Associates Announces 3rd Quarter Sponsorship of Kevvy’s Vision Project, Honoring Legacy of Community ServiceOctober 27, 2025 - 9:21 am
  • Why Testing Residential Well Water Is Crucial When Buying a HomeOctober 13, 2025 - 5:00 am
  • Building Your Geoprofessional Network: From Conference Small Talk to Lasting Business RelationshipsOctober 7, 2025 - 4:30 am
BSK Associates

(800) 669-3201

Corporate Headquarters

691 N. Laverne Ave. STE 101
Fresno, CA 93727
Local: (559) 497-2880

Hours of Operation

Monday – Friday 8 AM - 5 PM
Office hours vary by location

Subscribe to BSK PULSE

Thank you for signing up.
Please correct the marked field(s) below.
1,true,6,Contact Email,2 1,false,1,First Name,2 1,false,1,Last Name,2
Close
© 2026 Copyright BSK Associates | Accessibility |  NFY Interactive
  • Link to Facebook Link to Facebook Link to Facebook
  • Link to Instagram Link to Instagram Link to Instagram
  • Link to LinkedIn Link to LinkedIn Link to LinkedIn
  • Link to Youtube Link to Youtube Link to Youtube
Scroll to top Scroll to top Scroll to top