Fresno Southeast Surface Water Treatment Facility
The Southeast Surface Water Treatment Facility is a new treatment facility that will treat river water to drinking water standards and enable diversification of the City of Fresno’s water supply. BSK has been providing quality assurance construction materials testing services, which includes soils compaction testing, concrete, masonry and HMA sampling and testing. The facility will be fed with surface water from the Kings River through the new thirteen mile long Kings River Pipeline that BSK is also currently also performing inspections and test on, and the facility will have a treatment capacity of 80 million gallons per day. Construction began in January 2016 and is scheduled for completion in September 2018.


(800) 669-3201
Corporate Headquarters
691 N. Laverne Ave. STE 101
Fresno, CA 93727
Local: (559) 497-2880
Fresno, CA 93727
Local: (559) 497-2880
Hours of Operation
Monday – Friday 8 AM - 5 PM
Office hours vary by location
Office hours vary by location
Subscribe to BSK PULSE
|
|
Thank you for signing up. |


