Entries by Kimberly Stoll

Recharge Fresno Project 

Recharge Fresno Project  This is one of the largest public work projects City of Fresno has ever constructed with construction cost over $400 million dollars. BSK was involved in these projects for over 7 years, from design to construction. Recharge Fresno Project Phases The projects consisted of the Friant-Kern Canal Pipeline, a 4.5 mile long, […]

Congratulations Adam Terronez

Congratulations Adam Terronez, Branch Manager of our #Bakersfield #BSK, who has been appointed unanimously to fill the vacant seat on the BSK Board of Directors. Congratulations Adam Terronez!!!   BSK strongly believes in giving back to the communities in which we work. We make sure our community involvement goals have a positive impact on the […]

Hayward USD Solar Project

Hayward USD Solar Project The Hayward USD Solar Project flipped the switch becoming a cleaner, greener, school district. The Hayward USD Solar Project brought solar photovoltaic panels to thirty-three schools within the District. Additionally, all 33 sites received infrastructure improvements consisting of solar shade structures, roof, or ground mount arrays. With these upgrades the District […]

West Contra Costa USD Project

West Contra Costa USD Project The West Contra Costa USD project consisted of adding solar systems to thirty-four school sites within the school district. The solar improvements included carports, shade structures, and rooftop mounted systems. These solar improvements are estimated to provide 6.3 megawatts of clean energy. BSK provided Geotechnical Engineering, Materials Testing Services, and […]

Dalton Reservoir Project

Dalton Reservoir Project BSK holds an on-call environmental and geotechnical and materials testing contract with the City of Livermore. Dalton Reservoir Project was one of the task orders. This project replaced an existing 2.0 million-gallon steel water reservoir with a new 3.41 million-gallon steel reservoir on a 5.7-acre site in the northeastern portion of the […]

California Solar Project

California Solar Project The California Solar Project is a 1,200 acre project consisting of 171-MWdc of production facility. We are excited to announce that this facility will supply renewable energy to approximately 30,000 homes. Additionally, this project will help curb an estimated 22,000 cars worth of carbon dioxide yearly. BSK is proud to have worked […]

BSK: Downtown Merced Revitalization

BSK: Downtown Merced Revitalization BSK helps downtown Merced revitalize historical buildings. Three of Merced’s oldest buildings are receiving a face lift in hopes of bringing downtown Merced back to life. Downtown Merced has been under construction over the past year on Tioga Hotel, El Capitan Hotel, and the Mainzer Theatre. Not only are these three […]

Buckhorn Hotel Remodel

Buckhorn Hotel Remodel BSK proudly performed the geotechnical engineering and provided construction materials testing and special inspection for the Buckhorn Hotel Remodel. BSK’s services during construction included soil compaction testing, concrete sampling testing and special inspection services for the new pool, and spa and new lobby. The newly remodeled Cuyama Buckhorn hotel and restaurant has been […]

Tracy WWTP Project

Tracy WWTP Project Phase I-Water Transmission Mains and Pump Station Improvements, Phase II-Wastewater Treatment Plant Effluent Outfall Pipeline. BSK’s scope of the Tracy WWTP Project supports $24 million of improvements to include within, and connections, to the City’s wastewater treatment plant, across roadways, agricultural and unimproved and unincorporated property. For BSK, it involves a combination […]