Testimonials

Tartaglia Engineering

Brett and I enjoyed our get together and walking tour of your Bakersfield office and lab. Your facility is impressive and the level of energy very attractive. All this confirms Jay’s positive comments about you and BSK”.

John A. Smith

Tartaglia Engineering


Arvin-Edison Water Storage District

"On behalf of the Arvin-Edison Water Storage District, I wanted to express my appreciation for your quick response, flexibility, and long days spent in assisting the District with our emergency regarding the Intake Canal breach from Friday, February 9, through Saturday, February 17, 2007."

"Again, thank you, and in the future, please do not hesitate to let me know if there is anything I can be of assistance with."

Jeevan Muhar, P.E.
Engineer


City of Clovis - Public Utilities Department

"The City of Clovis has contracted with BSK Associates for work at the Clovis Landfill for more than 20 years. During that time, BSK has been the primary hydrogeologic consultant and has provided all groundwater, surface water, and landfill gas monitoring and reporting services at the facility. BSK has also performed feasibility studies for different projects, prepared operations and safety plans, designed various landfill improvements, and recently completed the facility's Non-Water Release Corrective Action Plan."

"BSK's staff has demonstrated the highest level of technical competency in the hydrogelogic and environmental monitoring tasks that are performed at the landfill. BSK's project management team maintains tasks that are performed at the landfill. BSK's project management team maintains excellent communications with City staff and has been very responsive to the City's needs. The City of Clovis has been continually satisfied with the work that BSK has performed, and would recommend them for similar work to other solid waste entities."

Luke Serpa
Interim Public Utilities Director


Vintage Production California, LLC

"It is well worth noting the successful collaboration of Andy Marsh, BSK and Taylor Equipment in the soils analysis, innovative and practical solutions and execution of work for the over-excavation and compaction of backfill for the Water Treatment Plant Site at 3rd Grubb."

"This was a team effort "extraordinary" beyond which any project engineer could hope for. It was both cost effective and "Value Added". If you have soil concerns in the future this is the team you want."

Joe Maisonneuve
Facilities Engineer